01
Define
Capture the application, site criteria, drawings and required deliverables.
ENGINEERING COORDINATION · PROJECT SUPPLY
InfraCore coordinates engineering requirements, sourcing and international supply for towers, steel structures and connection hardware. Start with a product or send your project drawings.
Saudi Arabia / GCC / Middle East
01 / PRODUCTS IN FOCUS
Review the application, reference specifications and configuration choices. Your selected product stays with you when you request a quote.

A drawing-led steel pole assembly for antenna support, with coordinated shafts, top framing, access and anchoring interfaces.
View specifications ↗
Drawing-defined angle-steel legs, base components and connection plates for lattice-tower assemblies.
View specifications ↗02 / PRODUCT & SERVICE SCOPE
Start with the primary structure, then define the connections, documentation and supply interfaces around it.
Transmission structures and electrical poles, scoped around your design basis.
Lattice towers, monopoles and camouflage assemblies with coordinated interfaces.
Tower members, pole sections, connection plates and project-specific steelwork.
Bolts, anchors, plates and mounting hardware specified as coordinated sets.
Telecom cladding and enclosure enquiries with defined geometry and performance needs.
A coordinated brief for prefabricated technical spaces and equipment interfaces.
Clear design inputs, controlled revisions and an agreed evidence package.
Procurement packages, packing requirements and shipping documentation aligned to the project.
03 / ENGINEERING TO DELIVERY
Capture the application, site criteria, drawings and required deliverables.
Resolve scope boundaries, technical interfaces and supplier requirements.
Agree revisions, inspection points, documentation and commercial terms.
Align packing, part identification and shipping with the receiving team.
04 / QA/QC & DOCUMENTATION
Define the evidence a project needs before an order is placed. Link specifications to controlled revisions, inspection requirements and agreed acceptance criteria.
What is required. Which revision controls.
What must be checked. Who must accept it.
How the receiving team connects parts to plans.
05 / INTERNATIONAL PROJECT SUPPLY
From packing instructions to delivery interfaces, plan the handover as carefully as the product. Destination requirements, shipping terms and document responsibilities belong in the initial brief.
06 / START WITH YOUR REQUIREMENTS
Send your scope, destination and technical requirements. We will use them to define the next conversation.
